MRG | Media Relations Group, LLC | What We Do



Design | FDOT District Six State Road (SR) 986/SW 72 Street/Sunset Drive/Marjory Stoneman Douglas Drive Historic Road Repaving Project from SW 84 Place to SW 69 Avenue

The Purpose:

The purpose of this project is to, among other improvements, preserve and extend the service life and safety of the roadway by milling and resurfacing the existing asphalt pavement.

The Project:

The project limits for the SR 986/Sunset Drive Repaving Project are from SW 84 Place to SW 69 Avenue along SW 72 Street in Miami-Dade County. In addition to the aforementioned items, the project will make drainage system improvements, construct a new sidewalk on the north side of the roadway and upgrade the existing sidewalk to comply with the Americans with Disabilities Act (ADA). It will also result in the partial reconstruction of medians, the modification of existing median openings while preserving landscaping, and upgrade signing, pavement marking and signalization.

The Public:

Media Relations Group, LLC, served as the main liaison between project team members and the community for this study. Together with FDOT, MRG embarked on a public involvement program that continued throughout the life of the study. We prepared several public meetings and coordinated with local organizations to ensure neighborhood participation. We coordinated the development and production of all project collaterals, including sign-in sheets, comment sheets, meeting location maps and fact sheets. We also drafted the Community Awareness Plan necessary to guide the team throughout the project process.

Project image

Click a title below to view links to project examples and details.

Projects

Firm Accomplishments in Florida

  • 1st RADS Installation Project
  • 1st Ramp Signaling Project
  • HAWK Beacon (First HAWK beacon system in South Florida)
  • 1st Managed Lane System Project
  • 30+ PD&E Projects
  • 50+ Design and Construction Projects

PD&E Project Details

Design Project Details

Design–Build Project Details

  • SR 826/SR 836 Interchange
  • City of North Bay Village
  • I–595 Express Corridor Improvements
  • I–95 Express, Phase 2
  • I–95 Express Managed Lanes, Phase 1
  • Florida's Turnpike All Electronic Tolling, Phases 1 and 2
  • SW 127th Avenue Design/Build
  • SR 5/US–1 Jupiter Bridges
  • SR 9/I–95 Design Build (Indian River County)
  • US 1 ITS
  • Government Cut Utilities Relocation
  • ATMS Installation in Central Broward
  • Bridges of the Isles Design Build Criteria Package

Construction Project Details

ITS Project Details

PI & Education Project Details

MPO Project Details

  • Miami-Dade County MPO Bicycle and Pedestrian Plan Update
  • Miami-Dade County MPO Long-Range Transportation Plan 2030 Update
  • Miami-Dade County General Planning Consultant Contracts
  • Broward County MPO Long-Range Transportation Plan 2035 Update
  • FDOT District Six Districtwide Intergovernmental Affairs and Community Services Liaison Contract

Municipal Outreach Project Details

  • Miami-Dade County MPO Bicycle and Pedestrian Plan Update
  • Miami-Dade County MPO Long-Range Transportation Plan 2030 Update
  • Miami-Dade County General Planning Consultant Contracts
  • Broward County MPO Long-Range Transportation Plan 2035 Update
  • FDOT District Six Districtwide Intergovernmental Affairs and Community Services Liaison Contract